Health Services Improvement in Nepal (HIT)
Narrative Description of Project:
The project consists of extension of Tikapur Hospital and construction of 4 health posts in 4 VDCs namely, Patharia, Durgauli, Narayanpur and Dhansingpur and 2 in Tikapur Municipality to upgrade the health facilities in Tikapur. The design stage of the Project was from April, 2012 to July, 201. The construction stage commenced in September, 2013 and got completed in March, 2015. Our firm was responsible for the complete design, drawings and documents and supervision works. The total cost of the Project is NPR. 197,300,000.00.
Description of Actual Services Provided by Your Staff :
Master Plan, Detail Architectural, Structural, Sanitary, Electrical , Air- Conditioning, Landscaping and Interior Decoration Designs, Preparation of Cost Estimation, Bill of Quantities, Tender Documents and Construction Supervision.
Narrative Description of Project:
The project consists of extension of Tikapur Hospital and construction of 4 health posts in 4 VDCs namely, Patharia, Durgauli, Narayanpur and Dhansingpur and 2 in Tikapur Municipality to upgrade the health facilities in Tikapur. The design stage of the Project was from April, 2012 to July, 201. The construction stage commenced in September, 2013 and got completed in March, 2015. Our firm was responsible for the complete design, drawings and documents and supervision works. The total cost of the Project is NPR. 197,300,000.00.
Description of Actual Services Provided by Your Staff :
Master Plan, Detail Architectural, Structural, Sanitary, Electrical , Air- Conditioning, Landscaping and Interior Decoration Designs, Preparation of Cost Estimation, Bill of Quantities, Tender Documents and Construction Supervision.