Grande Towers
Narrative Description of Project:
The Project consists of the construction of 2 towers namely Mars and Jupiter at Dhapasi. Each of these buildings consists of 1 basement and 13 other floors. The duration of the Project was from December, 2008 to December, 2010. Our firm was responsible for the structural design and periodic construction supervision. The total cost of the Project is NPR. 350,000,000.00
Description of Actual Services Provided by Your Staff :
Detail Structural Design and Drawings, Cost Estimation and Bill of Quantities of Structural Part, Periodic Construction Supervision.
Narrative Description of Project:
The Project consists of the construction of 2 towers namely Mars and Jupiter at Dhapasi. Each of these buildings consists of 1 basement and 13 other floors. The duration of the Project was from December, 2008 to December, 2010. Our firm was responsible for the structural design and periodic construction supervision. The total cost of the Project is NPR. 350,000,000.00
Description of Actual Services Provided by Your Staff :
Detail Structural Design and Drawings, Cost Estimation and Bill of Quantities of Structural Part, Periodic Construction Supervision.