Design and Supervision.
Design and Supervision.
The Project consists of construction of New OPD and Sub-Specialty Building The Building consists of 4 floors, with total floor area of 4,636.71 sq. m. The total cost of the Project is NRS. 217,914,000.00, exclusive of VAT. Description of Actual Services.
Provided by Your Staff: Detail Architectural, Interior, Landscaping, Structural, Sanitary and Electrical, Networking, Communication, Fire Fighting and HVAC Designs, Preparation of Cost Estimation, Bill of Quantities and Tender Documents with Evaluation of the Tenders including supervision works.
The Project consists of the construction of Eye Hospital Complex at Biratnagar. There are the Main Hospital Building, Registration Block, Security Block, Two Bedroom Quarter, Three Bedroom Quarters (2 nos.), Hostel Building, Pre-operative Ward, Canteen, Recreation Centre, Public Toilet, Generator Block, Garage and Parking Shed. Recreation Centre consists of various sporting facilities. The duration of the Project was from August, 2009 to August, 2012. Our firm was responsible for the complete consulting services. The total cost of the Project is NPR. 540,000,000.00.
Description of Actual Services Provided by Your Staff : Detail Master Plan, Architectural, Structural, , Sanitary, Electrical , HVAC and Fire Fighting Designs, Quantity Survey, Cost Estimation and Bill of Quantities, Preparation of Tender Documents, Tender Evaluation, Contract Award, Complete Construction Supervision.
The project consists of extension of Tikapur Hospital and construction of 4 health posts in 4 VDCs namely, Patharia, Durgauli, Narayanpur and Dhansingpur and 2 in Tikapur Municipality to upgrade the health facilities in Tikapur. The design stage of the Project was from April, 2012 to July, 201. The construction stage commenced in September, 2013 and got completed in March, 2015. Our firm was responsible for the complete design, drawings and documents and supervision works. The total cost of the Project is NPR. 197,300,000.00.
Master Plan, Detail Architectural, Structural, Sanitary, Electrical , Air- Conditioning, Landscaping and Interior Decoration Designs, Preparation of Cost Estimation, Bill of Quantities, Tender Documents and Construction Supervision.
The Project consists of construction of New OPD and Sub-Specialty Building The Building consists of 4 floors, with a total floor area of 4,636.71 sq. m. The total cost of the Project is NPR. 217,914,000.00, exclusive of VAT.
Detail Architectural, Interior, Landscaping, Structural, Sanitary and Electrical, Networking, Communication, Fire Fighting and HVAC Designs, Preparation of Cost Estimation, Bill of Quantities and Tender Documents with Evaluation of the Tenders including supervision works.